- School City of Mishawaka
- MHS Projects
- Interactive Sign on Lincoln Way
Projects at SCM
Page Navigation
- Projects at SCM
- Bids Schedule
- Battell Projects
- Beiger Projects
- Emmons Projects
- Hums Projects
- LaSalle Projects
- Liberty Projects
- Twin Branch Projects
- JYMS Projects
-
MHS Projects
- Auditorium Stage and Wall Repairs - MHS
- Built-Up Sand Capped Athletic Field System
- Elevator Repair - MHS
- Interactive Sign on Lincoln Way
- MEF Digital Art Studio
- MHS Traffic Safety Project
- Pool Equipment - MHS
- Roof Replacement - MHS
- Secure Vestibule - MHS
- Telephone System - All Buildings
- Track Lighting - MHS
- Track Upgrades - MHS
- Video Surveillance - All Buildings
- Visitor Check-In System
- Ad Center Projects
- Vision Initiatives
- Projects at SCM Calendar
Interactive Sign on Lincoln Way
-
The City of Mishawaka and School City have formed an effective partnership that benefits Mishawaka citizens. Mayor Dave Wood presented a rendering of a monument sign to the School Board on April 11, 2017. The sign is to be built south of Mishawaka High School’s auditorium along Lincoln Way.
In addition to Mishawaka High School and SCM messages, the City of Mishawaka will have access to place messages of City events on the sign. A potential aspect of the Mishawaka Brand could be the creation of monument signs at significant locations within the City.
Thank you to Mayor Wood and the City of Mishawaka for this generous gift.
Timeline
-
- Monument sign will be built during the summer of 2017.
- Sign will be operational by September 1, 2017.
- Monument sign will be built during the summer of 2017.
Project Progress
Funding
-
This project is being funded by:- A generous gift from the City of Mishawaka